Showing posts with label mass transit. Show all posts
Showing posts with label mass transit. Show all posts

Sunday, June 21, 2015

The Queens Public Transit Committee (QPTC) is presenting a movement and petition AGAINST the application of SBS (Select Bus Service) on Woodhaven Blvd

             MEDIA ADVISORY:
                The Queens Public Transit Committee (QPTC) 
           is presenting a movement and petition 
      AGAINST the application of SBS (Select Bus Service) on Woodhaven Blvd

           DATE: June 21, 2015

        CONTACT: QPTC Chairman Philip McManus at: PhilAMcManus@gmail.com
                                or by phone at: 718-679-5309

The QPTC will be at the Bayswater meeting on Monday and will be available for comment at that time. The Bayswater Civic Association invited the QPTC to present a public presentation on our group and our ideas including QueensRail, ferry, subway, bus and roadway service on Monday, June 22, 2015 at 8:00 pm


Another presentation will be given on Tuesday, June 30, 7:30 pm at the:
Howard Beach /Lindenwood Civic Association at St. Helen's School basement
157 Avenue and 83 Street in Howard Beach. 

Visitors to our site are encouraged to print the petition, sign, scan and email it to

QPTC Chairman Philip McManus who is available for comment and interviews by the media at:

or by phone at: (718) 679-5309

Please RSVP in advance with Philip McManus.

__________________________________________________

We, the users of Woodhaven and Cross Bay Boulevards, oppose the introduction of Select Bus Service (SBS), sometimes called Bus Rapid Transit, for the following reasons:
·            SBS was pre-determined by the city and the Department of Transportation as the solution to traffic and transportation problems. Funds were allocated for SBS prior to the first Community Meeting where it was presented merely as an "alternative." There has been no meaningful community participation!

·            Meetings and workshops were then held in which only the positive aspects of the plan were presented. One had to closely inspect the diagrams at the workshops to ascertain some of the negatives. Others were never disclosed.

SBS is Bad for Drivers:

·            On the northern portion of Woodhaven, two of the eight thru lanes will become local lanes only, separated by new islands, which will narrow the lanes making it difficult to pass large trucks and buses.

·            Two lanes will become bus lanes at all times. Right and left turn lanes will be eliminated slowing traffic.

·            This means that at major intersections such as Metropolitan Avenue, Myrtle Avenue, Jamaica Avenue, and Rockaway Boulevard, 10 travel lanes will be reduced to 4 lanes for cars and trucks at all times.  That's a 60 percent reduction in the capacity for traffic to enter and go through major intersections.

·            23 left turn movements on Woodhaven will be banned, in addition to the 60 that are already banned. You will be able to turn left about once every mile and probably not until the third turning cycle.

·            All left turn lanes on Cross Bay will be eliminated, forcing you to change lanes to go straight, slowing traffic.

·            Bus stops will be lengthened eliminating many parking spaces.

·           At Metropolitan Avenue all left turn traffic will be redirected to the narrow residential Trotting Course Lane, which will be become a two-way street and will have to accommodate large trucks.

·            Emergency response times will increase since emergency vehicles will get stuck behind buses picking up passengers at bus stops. They will have to cross to clogged lanes of traffic before being able to jump the divider into the opposing traffic lane. New trees will prevent them from easily crossing into the service roads.

·            The new lower speed limit of 30 mph has already gone into effect on Woodhaven. It will increase travel times and expenses since speed cameras will issue large fines. Police officers with radar guns will be able to issue summonses to vehicles traveling at just 32 or 35 mph. The speed limit on the bridges may also be reduced. 

·            Travel times will double with heavy traffic at all times instead of only during rush hours while bus lanes will be largely unused.  Your average speed will be reduced to 10 or 15 mph.


SBS is Bad for Bus Passengers:

·            Promises of faster passenger travel are a myth. During the off-peak hours when there are few buses on the road and traffic currently moves rather quickly, bus travel times will increase. There isn’t a shred of evidence that travel times will be improved by 35% as alleged.

·            A lower speed limit will mean buses will have to travel more slowly which will increase operating costs.

·            Longer buses will mean fewer buses since service levels are based on crowding levels.

·            Local Bus Service will be reduced as riders shift to Select Bus Service (SBS).

·            It will be impossible for express and SBS buses to pass local buses at most bus stops during the rush hour.

·            Fewer bus stops in Broad Channel and the Rockaways will result in longer walks to bus stops and will overcrowd beaches near remaining bus stops. Boardwalk businesses near Beach 105 Street will be harmed.

·            Current SBS routes exhibit major problems that the MTA is keeping secret, such as broken fare machines that are not repaired in a month's time and passengers receiving fines in excess of $100 although the bus driver tells them they can board the bus. Pavement markings are not maintained and wear out after only one year.

·            Ridership is down on in the past year on most SBS routes or fewer riders are paying their fare.


How Deception is Being Used to Promote SBS:

·            None of the questions or requests for data from the public has been answered.

·            One had to attend all four workshops to learn where all 23 left turning movements will be banned. DOT has not kept its promise to list on their website the locations where turns will be banned. Neither is there a list available of which bus stops will be removed.

·            The width of Woodhaven Boulevard was exaggerated to falsely give the impression that lanes can be removed without any negative impacts.

·            All publicity for the meetings was geared to bus riders, keeping drivers in the dark regarding proposed plans.

·            Two new bus stops will be added in Ozone Park and the Q52 will be extended to Far Rockaway. Both changes will increase ridership and can be accomplished now without waiting for SBS. However, by delaying these changes, the increased ridership will be attributed to SBS making it appear to be a success.

Why You Should Sign This Petition


·           The same powerful groups who support QueensWay (to rob us of repurposing the abandoned Rockaway Line also known as QueensRail) support SBS. It is a cunning plan to take away our time, freedom, and prosperity.

·            QueensRail would greatly speed travel times as well as spur economic development. Yet it wasn't even included in the study of the Woodhaven Corridor.

·            Faster bus and car travel times have been promised by reducing road capacity for cars and trucks and lowering speed limits. There has not been a shred of proof how this will be accomplished. Where is the data from the traffic and transit forecasting models? Why isn’t it being shared?  We have not been dealt with honestly.

·            The project cost increased from a $20 million initial cost to $231 million plus ongoing costs of at least $2 million per year. No one has explained how the additional monies will be spent or how spending ten times as much will increase the benefit tenfold. This is your tax money, not “free” federal money.

·            SBS costs more to operate than traditional Local and Limited Service, primarily because of the high cost to guard against fare evasion, yet provides limited benefits and many disadvantages such as longer walks to bus stops. The B44 SBS has been such a failure that no first year assessment has been made public due to the fear of jeopardizing planned new routes. Paid ridership is down by 8% in the first year of operation.

·            Queens Rail has been dismissed as too expensive when it could be built for not much more than what Queensway and Bus Rapid Transit would cost together. Contrary to claims, Queens Rail (the restoration of rail service to the Rockaway Beach Line) has NOT been extensively studied, openly, and fairly in comparison to the SBS: not like SBS/BRT, light rail, and subway in the Second Avenue Subway study. In short, Queens Rail has gotten the short shrift. What's fair and good for Manhattan should be fair and good for Queens.


I am signing this petition because we deserve to have Queens united through better transportation, not divided by a plan that greatly hurts drivers and businesses, while providing minimum if any benefits to bus riders.

Signed: ________________________________________     Date: ___/___/2015

Tuesday, October 14, 2014

Stand up against the stealing of our time and prosperity. Enough is enough! Fight for the Queens Rockaway Beach Line and faster transportation!!!

Dear Friends,

This is very Important Rally!!!  Stand up against the stealing of our time and prosperity.  Enough is enough! 

Please try your best to go to this QueensWay event and tell your family and friends to fight for the Queens Rockaway Beach Line and faster transportation. The QueensWay group is trying to stop the best opportunity to reduce travel times, traffic, pollution and unemployment.

Do you want to travel 2 1/2 hours to cross over Queens by public transportation?

Now is the time to let the city know that there is a better alternative to Bus Rapid Transit on Woodhaven and that is to reuse the Rockaway Line so that precious road space is not reduced by 50% which is what will happen if bike lanes are included in this plan. 25% if they are not. Can cars afford to move any slower on Woodhaven during rush hours? Not everyone can take the bus which will operate along the same routes they do today. There are no alternate auto routes available in the area except for neighboring residential streets. Do we want the cars to use those streets for long distance travel? 

Please bring a poster supporting the rail option for the Queens Rockaway Beach Line, the transportation plan. 

Today, Tuesday, October 14, 2014 at 11:00 am at Metropolitan Expeditionary Learning School 91-30 Metropolitan Avenue Forest Hills. 

Philip McManus 
Queens Public Transit Committee 
718-679-5309

Monday, September 22, 2014

Queens Public Transit Committee Seeks Funding For Lower Manhattan-Rockaway Ferry



Lower Manhattan, Sept. 22, 2014 - A rally was held tonight as residents of southern Queens invaded  Lower Manhattan in an effort to remind people that if enough support isn’t generated to save the ferry from the Rockaways to Manhattan, the service will end, making the trip by subway or express bus a longer trip and much less enjoyable.

The mission statement of the Queens Public Transit Committee is to improve all transportation options for Queens and the Pier 11 in Manhattan to Rockaway Peninsula is no exception. With Mayor deBlasio eliminating funding for the ferry link, residents of southern Queens are furious and have taken to the streets. The Belle Harbor Property Owners Association is also involved as they seek to protect and enhance the quality of life in their community. The Ferry is the common thread that binds both organizations.

Queens Public Transit Committee Chairman Phillip McManus has been fighting for keeping the ferry going but it’s been an uphill fight. To get the attention of Lower Manhattan, he’s organized a walking rally to let people know about it. He said, “We’ll arrive on the ferry at about 5:15 pm at Pier 11 and hold a press conference under the FDR near Wall Street. We will collect names and contact information to organize the passengers.  We will also have speeches and a photo opportunity. We’re following up on a rally we had on the steps of City Hall a couple of months ago as part of a process to educate the public about the funding cutoff.”

The plan was to march through areas such as Water Street and Stone Street which is where many people congregate so they can get the word about the ferry service discontinuance.

Through their past efforts, they accumulated an array of political figures dedicated to keeping the ferry going. Among them is Queens Borough President Melinda Katz. She said in a letter to Mayor deBlasio that, “…The Rockaway Ferry is a necessity for the Rockaway Peninsula and vital to its resiliency plans. Since the inception of the Rockaway Ferry in 2012, residents have come to view it as a primary means of transportation into Manhattan.”

New York State Assemblyman Philip Goldfeder has been a long-time backer of improving transportation options in southern Queens as healthier transportation options means greater economic opportunity.

Support for the ferry isn’t limited to Queens but to Brooklyn as well. City Councilman Vincent Gentile recently said at the June 11 rally on the steps of City Hall, “Other areas in the country would kill for a waterfront like we have here in New York. I want to emphasize the stopover in Brooklyn on the way to the Rockaways. One ride on the ferry and you’re hooked as opposed to riding the subway. If people knew if they could get to Manhattan and back easily with a ferry, they’d use it.”
The walking rally headed south to the Staten Island Ferry, the Statue of Liberty Ferry and walk north on Broadway to Wall Street and loop back to the ferry to Queens while giving out posters, flyers and asking people to sign petitions. 

Before hopping on to the 7:45 pm ferry back to the Rockaways, Phil McManus showed optimism and said, “The Queens Public Transit Committee supports faster transportation including the Queens Rockaway Ferry.  We refuse to be second class citizens in a city where everyone else’s concerns seem to come first.”

Tuesday, April 1, 2014

Rockaway Committee To Save The Ferry

On Thursday April 3rd 2014 at 6 P.M., the Queens Rockaway Ferry committee is holding a press conference at Beach 108th St. and Beach Channel Drive to say “Thank You” for Mayor de Blasio’s extension of the Rockaway Ferry service. The press conference was delayed due to severe weather over the last few months.

The Queens Public Transit Committee supports faster transportation including the Queens Rockaway Ferry. Good luck and congratulations to the Rockaway Committee to Save the  Ferry for a successful event.  

The Committee has confirmed Borough President Melinda Katz (D- Queens), Assemblyman Phil Goldfeder (D-Rockaway), City Council Member Eric Ulrich (R-Rockaway), Joseph Addabbo Jr. (D-Rockaway), Donovan Richards (D-Far Rockaway), Congressman Gregory Meeks (D- Rockaway), District Leader Lew M. Simon (D-Rockaway), and for Senator James Sanders Jr. (D-Far Rockaway) Liaison Lisa George attendance. 

Thank you. 

Philip McManus
Chairman
Queens Public Transit Committee 
718-474-0315

Friday, October 11, 2013

LOOKING FOR A QUICKER AND EASIER TRIP INTO MANHATTAN?

ARE YOU LOOKING FOR A QUICKER AND EASIER TRIP INTO MANHATTAN?
IF THAT’S WHAT YOU NEED TO IMPROVE YOUR QUALITY OF LIFE,
JOIN OUR QUEENS PUBLIC TRANSIT COMMITTEE!!!
 
The Queens Public Transit Committee is promoting the reactivation of the Rockaway Beach Line (RBL) in Queens as a mass transit option. This means restoring the former Long Island Rail Road right of way in a manner in which it was intended – a transportation mode that will offer a quick and safe trip into central Queens and Manhattan.
 
What restoring rail service to the line will do is to reduce long travel times, dangerous streets and overflowing traffic. Rail service has always resulted in increased economic activity which results in more jobs for everyone. Workers and students will be able to get to their destinations quicker while increasing their quality of life which can translate into more productivity overall. When the LIRR operated trains there, it took a maximum of forty minutes to enter Manhattan compared to at least 2 or 3 times that amount right now. This transportation crosstown corridor was lost to us in 1950 and 1962 when it was shortened, then eliminated.
 
Increased bus service is not the answer as they tend to get stuck in traffic which can result in an inconsistent spacing of buses and long wait lines to get on them.
 
JOIN OUR QUEENS PUBLIC TRANSIT COMMITTEE!
Unite with your fellow commuters and complain about being stuck in your car traffic or in an overcrowded bus.
Don't spectate...participate and do something about it.
The Queens Public Transit Committee is organizing a march and rally for better access to jobs, schools and the entire New York Metropolitan area through the reactivation of the Queens Rockaway Beach Line, subway or LIRR. 

Send this message to Governor Cuomo an e-mail to: press.office@exec.ny.gov
 
FIGHT FOR BETTER ACCESS TO JOBS AND SCHOOLS
WITH FASTER TRANSPORTATION OPTIONS BY
REOPENING THE QUEENS ROCKAWAY BEACH LINE
AS THE NEW QUEENS CROSSTOWN RAIL LINE!!!
 
The Queens RBL is only one to six blocks east, travels north/south and parallel to Woodhaven Boulevard, from Penn Station through Central Queens to South Queens.  
 
For more information, contact Queens Public Transit Committee by visiting this blog for information about fixing this vexing transportation problem: http://rockawaybranchline.blogspot.com/ 
 
Philip McManus, Chairman
Queens Public Transit Committee